Tuesday, April 24, 2007

Sock Pirates Ahoy - Spoil(er)s Ahead

Lookie here what landed on my doorstep this afternoon.


A parcel from Blue Moon, with the latest Rockin' Sock Club shipment. If you're desperate for spoilers click on the picture of the parcel or go here since I can't figure out how put a jump cut in this post (I'll move the photos back over here in a couple of weeks).

The yarn is amazing! Easily the best club kit ever. I can't wait to start working on these tomorrow!

P is for procrastination, plain, and pieces

What have I been up to the last few days? Well, I haven't been working on the 120-page summary that I need to pass the 100% final I have tomorrow, but I do have a spiffy sock to show.

After having made it through the first sock and a bit, I am still wavering between loving them and being a little meh about them. Despite my ambivalence, I'm enjoying how quickly these are coming along and am more amused than I should be by the way that the yarn is pooling at different points along the way.

I tried to fancy them up a bit by deviating from my usual recipe and adding a 1x1 twisted rib cuff and an eye of partridge heel flap (in case you're wondering why the cuff is biasing). The yarn is Lightweight STR in a colourway called Jewel of the Nile (the above photo being a pretty accurate representation of the colour).

Progress on the Sand Dollar Pullover has been slow. Here's a photo of all of its parts, with the front pieces laid out to illustrate how they're supposed to come together.

Everything has been blocked and the seaming has begun (meaning that of the 11 seams that must be sewn, one has been finished and one has been pinned). I'm still a little worried that things are not going to fit together quite like they're supposed to, despite my careful measuring.

This is a closeup of the seam that has been finished (click to big-ify). Although it looks a little lumpy (nothing a good blocking won't fix), I'm pleased with the result.

Now to make friends with the Canadian Income Tax Act and finish studying for my last law school exam, and possibly my last academic exam ever.

Friday, April 20, 2007

Reckoning

I don't like to think of myself as a yarn hoarder. A yarn aficionado, yes. One that is appreciative of all things woolly, yes. A hoarder, never!

That is why, during a fit of reorganization I found this to be especially troubling.


That is enough sock yarn to knit 34! pairs of socks. Sadly (or happily depending on how you see these things) this doesn't include the 4 skeins currently winging their way to me. This combined set of factors was enough to convince me it was time to consider picking up these again.


This sock is in its sixth incarnation. It started off as a plain toe-up. It then found life as a top-down jaywalker, which was later ripped to make way for a larger jaywalker. After some serious pooling, it became a sock of my own design. Problems with the design led to a sock with a clock/cable motif down the side and now it's been ripped back to once again become a plain old sock. The picture above is one taken during life #5, the clock phase, and thus is a little outdated.

I'm still not loving the plain sock but I've decided there's no fighting the yarn on this one. It if wants to be a plain sock, then and a plain sock it'll be.

Also, I've finished knitting and blocking all the pieces for the sand dollar pullover. More on that next time.

Saturday, April 14, 2007

A sweater is born

No time to chat, but a few photos of the latest bit of knitted comfort (please excuse the self-portrait charm of these puppies). I present: the oft-resented, now loved new sweater.

Project Specs: Under the Hoodie (Stitch n' Bitch )
Yarn: Malabrigo Worsted Merino in Geranio, Lettuce, and Cuarzo
Amount: 6 hanks of Geranio, 1 of Lettuce, and 1 of Cuarzo
Left over: enough to make about three hats worth (one in each colour)
Needles: US 7 straight and US 9 circ
Size: Small (36") to fit a 36" bust
Started: November 2005
Completed: April 2007
Modifications: I added some length to the body and sleeves. The rest follows the pattern pretty closely.

After a few wears, this sweater has proven to be a cosy (read: warm and distractingly soft) spring chill chaser. I was a little unsure about the colours at first, but now that it's finished I find them cheery and not at all overwhelming as I initially feared (I expect that the amount of excess fuchsia dye that bled from the MC is to blame for that concern). I'll admit that while tackling this project, I also had reservations about Malabrigo's tendency to pill. They remain unfounded since the sweater is holding up much better than expected (perhaps it's the tight gauge).

Time to throw myself back into the isolation cave (a.k.a. my apartment), where I will lead a sheltered and knit-free existence until I survive my first set of exams.

Monday, April 09, 2007

Have I mentioned...

I despise finishing. It takes the courage of 1,000 strong-willed knitters to force me to tackle any kind of finishing. I've always found this to be an odd personality trait given my general elation with both the finished product and the shorter to-do list.

Exhibit A: The malabrigo sweater



Nothing has better demonstrated my completion aversion than the malabrigo sweater.

The yarn for this project followed me home in November of 2005 as a birthday gift from my mother. I cast on immediately and didn't put it down until I had the whole sweater knit about 6 weeks later. After this initial affair, the whole thing was shoved into a dark corner of the stash for another 8 months (putting us comfortably in the month of August, for those that are keeping track). After a half-hearted attempt at setting the sleeves, it was again forgotten. Spurred on by the cool weather in late October, I struggled through half of the finishing then gave up until just now.

Spurred on by this month's project spectrum colours, I finally locked myself into a distraction-free zone and forced my way through the seaming last night (over a year after completing the knitting). Now there are ends to weave in and I feel my interest waning once again.

Exhibit B: The books

The additional evidence suggests that my aversion to finishing isn't knitting specific. It also taints my legal studies.

I am fortunate enough to be in the final semester of a twenty-year education. One would think that after a particularly gruelling three-year stint in law school, I would be raring to finish my studying and move on with my life. The pristine, above-pictured books suggest otherwise.

For better or for worse, one more week and I'll be through the worst of both.

Send strength.

Tuesday, April 03, 2007

Mail Call

I've been meaning to post this yarn for the last week and a half or so. It is the latest Blue Moon Fiber Arts Rockin' Sock Club shipment (there are still twenty spots left if you want to join). The colour is called Monsoon and comes with a really interesting reversible sock pattern.

Here's a better picture of the hank's colours that should give you an idea of how they'll blend together.

This is definitely not a colour that I would have chosen, but it's really starting to grow on me. I love the leafy green and muddy brown tones. It makes me want to grab a pair of rubber boots and go puddle jumping like I did as a child.

I'm hoping that I'll get moving on these socks in the next couple of weeks. It is unlikely since I already have a couple of pairs on the needles and am feeling compelled to finish at least one of those first.

Monday, April 02, 2007

Reflection

A quick photo essay of my February and March Project Spectrum projects.

Stay tuned for all that is planned for April and May's colours: green, yellow, and pink.

Saturday, March 31, 2007

Spin City

Remember these rovings?

I've finally figured out what I'm going to do with the one of the left-hand side. It is a Lorna's Laces roving in the Seaside colourway. After seeing this waaaay back, I decided that this roving would be perfect stranded together with another merino/silk roving that still needs to be spun.

Here's what I've managed to accomplish so far on this project. Needless to say this is a long-term/post-exams sort of project.

Once this bobbin is full, I plan to Navajo ply it to shorten the colour changes and then get started on a second bobbin of singles.

Friday, March 30, 2007

First

My very first fair-isle. It's a little bumpy, and doesn't have much give but it's mine and I love it! Here's a photo of the first mitt in progress.

I've been drooling over Eunny's Venezia pullover from the Winter issue of Interweave Knits since she gave us the first sneak peak on her blog.

Seeing as how I still haven't finished a sweater project (details on why to come), have never done stranded colour-work, and start to hyperventilate when a pattern calls for little needles (except socks) it was clear that a warm-up project was in order. These mitts were perfect since they are small (both in size and in yarn investment), require fair-isle, and use Jamieson's Shetland Spindrift (the same yarn called for in Venezia).

Here is the front just short of the halfway mark.

And the finished product, nicely posed with a napping dog (click for larger):

Project Specs: Norwegian Mittens
Yarn: Jamieson's Shetland Spindrift in Nighthawk and Granite
Amount: 1 skein in each colour
Left over: a wee bit of each colour
Needles: US 3 DPNs
Size: To fit a woman's hand
Started: February 2007
Completed: March 2007

The yarn seemed a little scratchy after being knit up but blocking has turned it into a soft and uniform fabric. I didn't make any modifications to the pattern but next time I knit these I will be sure to make the thumb a few rows longer for a better fit.

I've also been working on some spinning that is moving slowly. Details tomorrow

Monday, March 26, 2007

A Hint of Spring

The weather here was gorgeous today. Everywhere you looked, jackets were undone, hats and mittens were discarded, and winter boots were replaced with summer shoes. In some ways it makes me sad to see winter go and with it the sheepy goodness of warm woolly layers and the beauty of fresh snow. On the other hand the warmer weather means balmy afternoons on patios, summer cottons and silks, and the start of Toronto's best outdoor festivals.

The change in the weather has also inspired me to pick up a project that was cast aside when the cold took over the city back in November. This is the beginning of the Sand Dollar Pullover from Norah Gaughan's amazingly inspiring book, Knitting Nature.

This is my first project from the book, but I have the yarn for at least three others when I finally get around to working on them.

I'm using Posh Yarn's Victoria which is a cotton/silk/cashmere blend in a colour called Lagoon (and is pretty accurate in the photo below). It is a bit splitty but is a dream to work with and blocks beautifully.

So far, I've made it through all of the pieces for the front and back, and am now working to finish the sleeves so I can block all the pieces and start seaming it up. I'm hoping to finish the sleeves in the next couple of weeks so I can get some wear out of this during the summer (if I can bring myself to get the seaming done).

Here's a close-up of the sand dollar part of the sweater. I've had to re-knit it three times so far and I'm still not positive that I'm happy with the way that it has turned out. I do love the way the leaf points meet to form a pentagon in the center. The construction of this garment is really stunning.


In other news, the postman finally brought a long awaited parcel that I can't wait to share with you...next time.

Saturday, March 24, 2007

Ooops...

Six weeks since my last post! It is shocking how quickly time flies. Good news is that although there hasn't been much time for blogging, there has been loads of time for knitting. That means that I should (fingers crossed) be able to start posting on a regular basis again.

First up, I thought I should show you some of the stuff I've been working on for Project Spectrum before April comes along and the colours change on me.

I was inspired by this to make this.


The above photo is taken pre-blocking and this next one was taken post-blocking. It still amazes me how much of a difference a simple dip in the sink makes with most yarns.

Project Specs: Lady Detective Hat (Knit 2 Together) - many mods
Yarn: Malabrigo (100% merino) in the Indigo colourway (double-stranded)
Amount: 1 hank
Needles: US 11 (8.00 mm) Denise needles
Size: To fit a woman's head
Left over: none
Started: January 2007
Completed: February 2007

I made many of the same modifications mentioned here. In addition to those I also eliminated the purl ridge at the end of the crown and shortened the depth of the hat.

Now back to my Sand Dollar Pullover. Details on that next time.

Saturday, February 10, 2007

Great Socks

Finally, another pair of finished socks! Socks always take me months and months to knit since I really only work on them during the commute to school. This particular pair was started back in October.

Project Specs: Basic Sock
Yarn: Posh Yarn's Lucia (30% cashmere/70% merino) in the Cosmopolitan colourway.
Needles: 2.25 mm 30" Aero circs (Magic Loop)
Size: To fit a woman's size seven shoe with a 6 1/4" cuff.
Left over: approx 93 yards
Started: October 2006
Completed: Feb 2 2007

A close-up of the gusset. The colours are truest in this photo. This yarn is amazing! It is so soft and was a breeze to knit. The socks are very warm, cushy and comfortable. I will definitely use this yarn again despite being a little concerned with how well these socks will wear as they have already begun to pill.

Perhaps my favourite thing about these socks is that unintentionally, the toes match up perfectly.Now if I could only finish some schoolwork . . .

Friday, February 09, 2007

Belated FF (sort of)

One...two...skip a few...I meant to post this last week but I went home and my parents only have dial-up. Good news is that in two weeks there has been much in the way of finishing. Most notable is the shawl for my grandmother. Perfect timing since her birthday is today and this month's Project Spectrum colours are blue, grey, and white. The shawl ended up being comfortably large, making it the perfect chill chaser. Most exciting is the fact that I ended up using all but two yards of the yarn I'd spun.

Here's a photo of (most of) the completed shawl. If you look closely you can see my toes, included for scale. I'm really pleased with the way the striping worked out. I wasn't sure what to expect from the finished yarn since this was my first real spinning project.

Project Specs:
Evelyn A. Clark's Leaf Lace Shawl.
Needles: US 9 Denise
Yarn: 623 yards of my handspun
Started: October 2006
Finished: February 1, 2007

Here's a better photo of the pattern detail after the shawl had been unpinned and worn. I love the tweediness of the yarn. The colours are truer here.

One final look.

Onwards.

Friday, January 26, 2007

Finishing Fridays

Long time no post. The last few weeks haven't given me much knitting time. I started this blog to motivate me to shrink the stash. I started off with 67 projects, 14 of which were on the needles. The stats at this point are not looking promising. I have 75 projects in total, 13 in progress. Clearly the original plan was flawed. To deal with this and to compensate for my general avoidance of completing finishing work, I am instituting Finishing Fridays. This means that every Friday I have to do some sort of finishing: whether it's sewing buttons, weaving in ends, sewing seams or whatever else needs to get done.

This Friday's accomplishments:
The plying for grandma's shawl is finished. Here's a blurry closeup.

And the finished product (with a standard pair of scissors included for scale):

Many hours of spinning has left me with about 625 yards of two-ply, light worsted yarn. I've started to swatch for the shawl and so far it's knitting up beautifully. The thrill of knitting my handspun has yet to wear off.

I also knitted Calorimetry using the wool/silk I spun up last month. What a great project! A quick day of knitting and I ended up with this:


I love the way the colours in the yarn interacted with this pattern, moving from light on the edges to dark in the middle. Lots of people have posted about the finished product being too big. I opted not to modify the pattern and am very pleased with how it turned out. There is enough fabric to cover most of my head without being unnecessarily large. It is the perfect thing to help me through the cold snap we've been having the last week or so. Here is a closeup of one of the buttons I sewed on today to finish this project up.

Last but not least, I made the felted tote from One Skein. Another quick knit, made from Lamb's Pride Bulky in a colour called Wild Violet (a little darker than in this picture). I finally got around to weaving in the ends and doing the seaming. Next it's into the washer for a quick felt, hopefully I'll get that done when I go home next weekend.

Now it's off to stand in line at the Lululemon warehouse sale.

Wednesday, January 10, 2007

Marathon

If nothing else the last few days have been productive on the spinning front. I finished the singles for the shawl.


Now it's time to ply.

Sunday, January 07, 2007

Small and Big

Instant gratification anyone? Feeling a little overwhelmed with the number of projects on the go and general life stress, I decided that finishing a lingering project would help turn things around. A few hours later and I had a funky knitted ring. A great way to use up those little bits of yarn I can't bear to throw out.

I've also been doing some spinning...

Lorna's Laces 10 oz Pencil Roving in Seaside and Tahoe that I picked up here while on summer vacation. Inspired by this, I decided that I wanted to make a handspun shawl for my grandma out of the purply-blue roving. Here's how the first bobbin is going so far. Wish me luck.

Monday, December 18, 2006

I *heart* the mailman

The new STR Rockin' Sock Club shipment arrived at my house safe and sound this afternoon (huge relief after the mail theft problems I'd been having). I may or may not have spent the day compulsively checking the KAL for pics of other people's kits, counting the number of days it took past shipments to arrive, and running to the door to stare out of the peephole at the slightest sound.



















I am ecstatic about the red skein (click to big-ify). I love, love, love red and have been wondering all along when it would show its yummy primary goodness. As for the Rare Gem, I'm still not convinced, and find myself wavering between loving it and HoHum-ing it. I suppose I won't be able to tell until it becomes socks. Perhaps it will become a pair of these depending on what happens during swatching.

I tried to get a good picture of the finished sock on the pattern but it was not meant to be (if you supersize the photo and squint you can almost see part of it). For those of you who are dying to know, it is a stunning beaded cable-rib pattern by Sivia Harding who designed these. The pattern itself reminds me of a simpler/easier, non-knee sock version, of these in that there is a fancy design at the top, that morphs into a simple cable to the heel, and then becomes pretty heel and front ankle detailing.

The good news is that it's here and I can focus on more urgent matters (like that pesky 100% final tomorrow). For now it's back to studying. I promise more regular postings with actual knitting content after it's done. Methinks a trip to the bead store is in order tomorrow, on the way home from the beastie!

Wednesday, December 13, 2006

Moebius Caplet

If nothing else, studying for exams has meant significant progress is made on my knitting. I use knitting to cope with stress, procrastinate, and as bribery for a chapter well learnt. Enter The Handmaiden's gorgeous Moebius Caplet kit. Cat Bordhi's Moebius Cast-On is genius, pure genius. It is also very simple if you just don't try to understand what is happening until you get going and follow the instructions. Exactly.



If you look carefully at the in-progress photo you can see the way that the cable spirals around to create the moebius. This is the second one of these caplets that I've made and both times it has been fun, fast, and interesting. This particular project came home with me from my LYS on Saturday and was finished by Sunday evening! A great last minute Christmas gift if I do say so myself.














Yarn: Handmaiden Grande Godiva (2 skeins) 50% silk/50% wool
Pattern: Moebius Caplet
Needles: Denise US 15 with 40" cable

Tuesday, December 12, 2006

Cheating decreases

Feast your eyes on these puppies. Four months of committed sock knitting to produce an exquisite lacey (subtle mesh patterned) anklet. Both yarn and pattern came to me in my July Blue Moon Fiber Arts Rockin' Sock Club kit.















Yarn: Socks That Rock Lightweight in Peaseblossom (1 skein)
Pattern: Hippy Crunchy
Needles: 2.25mm Clover Takumi DPNs

Perhaps the only reason I ever finished these socks was that I found a way to cheat the K3tog and SSSK decreases about 10 rounds in. To encourage other knitters that feel a little woozy when see they a pattern with muti-stitch decreases, I thought I'd put a quick tutorial together on how to accomplish the aforementioned without breaking a sweat or a dpn. Note that basic information on these two decreases can be found here.


The Majestic SSSK

First you need to slip 3 stitches as if to knit from the left to the right-hand needle, just like you were doing a regular SSK.














Next you SSK the two stitches closest to the tip of your right hand needle as you normally would (if you're really struggling you can just SSK the first stitch, and use the leap-frog technique described below to deal with the other two later.)














Here's the cheating part. Lift or leap-frog the unworked-but-previously-slipped-stitch on the right-hand needle (now the second one from the tip) over the SSK that you just worked.














Et Voila! A lovely, angst-free, and slightly blurry SSSK.















The Regal K3tog

This one follows the same principles as the SSSK but with one extra (easy) step. First you'll knit the first two stitches on the left hand needle together (K2tog) same as always (again if worst comes to worse you can just knit the first stitch and repeat the leap-frogging described below twice for the same effect.)














Now you have your worked decrease on the right-hand needle and your left over stitch on the left-hand needle (see picture).














Here's the extra step part. Slip the worked K2tog decrease purlwise from the right to left-hand needle so that it looks like this.














Then you just lift or leap-frog the remaining stitch to be worked over your decrease.














Now slip the whole thing purlwise back onto to the right-hand needle and you're done another beautiful decrease.